Wednesday, July 31, 2013

Travelers can expect delays in Shoshone

Work starts at junction of Highways 93 and 26


By TERRY SMITH
Express Staff Writer

    The Idaho Transportation Department has announced that work began Monday to reconstruct roadways and sidewalks at the junction of U.S. Highway 93 and U.S. Highway 26 at the railroad crossing in Shoshone. The project is expected to impact traffic for about two months and should be completed by the end of September.
    The work is being performed by Valley Paving, of Bellevue, under a $388,000 contract with ITD.
    The project involves reconstructing the roadway through the junction on both the north and south sides of the railroad crossing. The project will also involve replacing several areas of curb, gutter and sidewalk adjacent to the roadway reconstruction to improve storm water drainage and to comply with the requirements of the Americans with Disabilities Act.
    ITD cautioned that drivers can expect delays and that traffic will be reduced to one lane in each direction through the construction zone. ITD reminds drivers to watch for flaggers during the duration of the work.
    During construction, there is a 10-foot width limit for large trucks. ITD suggests that drivers consider an alternative route to avoid traffic conflicts.
    The project also included work in June by Union Pacific Railroad to reconstruct the railroad crossing.




About Comments

Comments with content that seeks to incite or inflame may be removed.

Comments that are in ALL CAPS may be removed.

Comments that are off-topic or that include profanity or personal attacks, libelous or other inappropriate material may be removed from the site. Entries that are unsigned or contain signatures by someone other than the actual author may be removed. We will take steps to block users who violate any of our posting standards, terms of use or any other policies governing this site. Use of this system denotes full acceptance of these conditions. Please review the full rules governing commentaries and discussions. You are fully responsible for the content that you post.

The comments below are from the readers of mtexpress.com and in no way represent the views of Express Publishing, Inc.

You may flag individual comments. You may also report an inappropriate or offensive comment by clicking here.

Flagging Comments: Flagging a comment tells a site administrator that a comment is inappropriate. You can find the flag option by pointing the mouse over the comment and clicking the 'Flag' link.

Flagging a comment is only counted once per person, and you won't need to do it multiple times.

Proper Flagging Guidelines: Every site has a different commenting policy - be sure to review the policy for this site before flagging comments. In general these types of comments should be flagged:

  • Spam
  • Ones violating this site's commenting policy
  • Clearly unrelated
  • Personal attacks on others
Comments should not be flagged for:
  • Disagreeing with the content
  • Being in a dispute with the commenter

Popular Comment Threads



 Local Weather 
Search archives:


Copyright © 2024 Express Publishing Inc.   Terms of Use   Privacy Policy
All Rights reserved. Reproduction in whole or in part in any form or medium without express written permission of Express Publishing Inc. is prohibited. 

The Idaho Mountain Express is distributed free to residents and guests throughout the Sun Valley, Idaho resort area community. Subscribers to the Idaho Mountain Express will read these stories and others in this week's issue.